Kit contents include:
- Chip fan (x1)
- Metal parallel (x2)
- 5/32″ 4-flute endmill (x1)
- 1/16′” 4-flute endmill (x1)
- 4-40 threadmill (x1)
- 3/16″ collet (x1)
- 1/8″ collet (x1)
- USB with Optic Cut code
With Clamps:
C Clamp (x2)
Soft Jaw (x2)
Clamp Feet (x2)
M4x20 (x2)
M4x90 (x2)
M5x6 (x1)
M5x35 (x4)
T-Slot Nut (x4)
Insulating Washer (x4)
M4 washers (x4)
Note: current expected lead time for this product is 3 weeks.
Note: either GG3-S or GG3 with free firmware upgrade is required for optic cut.